top of page
Sutherland leisure centre, NSW
Removal and replacement of 240m construction/expansion and tile joints, with the pool full. Job completed underwater with Scubapoxy adhesive epoxy.

20210422_191105

20210422_191137

20210422_191159

20210422_191105
1/5
ANU Aquatic centre, Canberra
Removal and replacement of expansion and tile joint underwater.

20201022_200627

20201022_200619

20201022_200623

20201022_200627
1/4
Griffith University QLD
Removal of damaged floor tiles, grind tile adhesive, apply new tiles underwater.

20220608_164558(1)

20220126_113406

P1016003 (002)

20220608_164558(1)
1/6
Stromlo Leisure Centre, ACT
Removal and replacement of damaged silicone joints underwater.

20210914_143239

20210914_143453

20210914_143330

20210914_143239
1/6
Gold Coast Aquatic Centre, QLD
Remove damaged render on wall, replace and re-tile.

20220612_070929(2)

20220608_102800(1)

20220612_071009(2)

20220612_070929(2)
1/7
Camden War Memorial Pool, NSW
Remove damaged Pebblecrete, grind and make safe.

20230208_094624

20230208_095332

20230208_135310

20230208_094624
1/7
Goulburn Aquatic Centre, NSW
Remove and replace 500 lineal metres of tile and construction silicone joints.

20230922_135510

20230907_101824

IMG_20231009_100326

20230922_135510
1/7
Canberra Olympic pool, ACT
Re-painting of olympic 50m pool

20240902_124405

20240903_113642

20241021_091000

20240902_124405
1/13
bottom of page